top of page

Projects

I-395 EXPRESS LANES
The Lane Construction Corp. 
The project added a third reversible HOT lane on I-395, accessible for free by vehicles with three or more occupants and an E-ZPass Flex transponder, or for a toll by all others. The improvements were primarily built within the existing footprint of the I-395 HOV lanes.

395.jpg

I-66 EZ Pass Lanes
FAM Construction

Interstate 66 Outside the Beltway project helped transform this critical NoVa artery to relieve congestion, improve safety and provide more predictable travel times. The express lanes opened in December 2022 and are helping move between 2,000 to 4,000 more people per hour along the corridor.

66-at-Beltway-ddi-1880x1254.jpg

VDoT Snow Contractor I-66
VDOT/FMCC 
We provided snow removal services to VDoT for over 20 years maintaining I-495 and were asked to take care also of I-66 corridor with a fleet of up to 20 trucks

IMG_5706.jpeg

I-495 EXPRESS LANES 1st PHASE
Flour-Lane Corporation
The 495 Express Lanes opened on November 17, 2012, with the dynamic tolling system, variable messaging signs and operations center functioning well under real traffic conditions. The opening of the Express Lanes introduced the biggest change to the region’s traffic patterns in more than 30 years and improved the traveling experience for everyone who uses the Capital Beltway.

66-at-Beltway-ddi-1880x1254.jpg

I-495 EXPRESS LANES 2nd Phase
The Lane Construction Corp.
Just north of Tysons, a 2 mile extension of the 495 Express Lanes north toward the American Legion Bridge with new connections to the Dulles Toll Road and George Washington Memorial Parkway.

IMG_5588.HEIC

Long Bridge RR Project.
(coming soon)

The Long Bridge corridor will provide congestion relief and solve a major pinch point challenge for rail along the east coast, also enhance the pedestrian and bicycle network by providing convenient, safe options for connectivity and accessibility. 

LB.webp
bottom of page